DISCOVER QUALIFY RESPOND MANAGE

Win the work you should be winning.

with the AI-First Response Management System for Tenders, RFPs, and ITTs
Show me

or book a call with the team

INSTITUTIONAL MEMORY COMPOUNDS TENDERSRFPSITTS FITRISKVALUE EVIDENCECOMPLIANCE WIN PIPELINEFORECASTREVENUE 01 DISCOVER 02 QUALIFY 03 RESPOND 04 MANAGE

The complete system for winning tenders, RFPs, & ITTs

Every tender, in one place, from the day it lands to the day it's won.

Discover

Stop digging through email digests. Every tender lands in one inbox.

Explore discovery

Tenders

Showing 1–7 of 170 results

Search Open

Local Food Systems Precinct – Block 15

AusTender

POL2024-506 Acoustic Engineers Panel

Vendor Panel

Audio Visual (AV) Upgrades

TenderSearch

Qualify

Score every tender in seconds. Skip the ones you were never going to win.

Explore qualification

Qualification Matrix

Go/No-Go Analysis

Active
Budget Alignment85%
Capability Match92%
Win Probability68%

GO

Recommended Action

Respond

Write responses with AI, using your own best answers and evidence which improves every time.

Explore response

RFP_TenderManagement.pdf

Ready
AI Assistant
Draft response for 3.2.1 secure document storage
Tendl provides AES-256 encrypted storage with SOC 2 Type II compliance. All documents are versioned and auditable...
Send

Manage

We turn tendering into a weighted, forecastable revenue pipeline.

Explore pipeline

Revenue Pipeline

Commercial Visibility

Live

Total Open Opportunities

$15,000,000

Median deal size: $3,820,000

Weighted Open Opportunities

$4,500,000

Expected win rate: 32%

Weighted Closed Pending

$1,250,000

Expected win rate: 28%

Closed Won Opportunities

$8,500,000

Win rate: 41%

12
8
5
3
1
Discovery
Qualified
Response
Submitted
Award

Tenders

Showing 1–7 of 170 results

Search Status ▾ Open

Local Food Systems Precinct – Block 15 Section 38 Fyshwick

26 Mar 2026

AusTender

POL2024-506 Acoustic Engineers Panel

16 Feb 2026

Vendor Panel

Audio Visual (AV) Upgrades – Sfera's Convention Centre

16 Feb 2026

TenderSearch

Plant Equipment – 3.5 Tonne Towable Mini Excavator

23 Feb 2026

Email Forward

Managed Print Services – Whole of Government

10 Mar 2026

AusTender

Stormwater Drainage Upgrade – Stage 2 Civil Works

4 Mar 2026

Vendor Panel

ICT Security Assessment & Penetration Testing

28 Feb 2026

TenderSearch

Qualification Matrix

Go/No-Go Analysis

Active
Discovery
Qualified
Pipeline
Budget Alignment85%
Capability Match92%
Win Probability68%

GO

Recommended Action

RFP_TenderManagement.pdf

247 requirements Ready

Extracted Requirements

3.2.1Secure document storage
4.1.3Data privacy compliance
5.2.7AI-generated first drafts
6.1.2Collaborative editing
7.3.4Role-based access

18

Must/Shall

100%

Extracted

AI Assistant 3 evidence docs attached
Draft response for 3.2.1 secure document storage
Tendl provides AES-256 encrypted storage with SOC 2 Type II compliance. All documents are versioned, access-controlled, and auditable per ISO 27001 standards.
Send

Revenue Pipeline

Commercial Visibility

Live

Total Open Opportunities

$15,000,000

Median deal size: $3,820,000

Weighted Open Opportunities

$4,500,000

Expected win rate: 32%

Weighted Closed Pending

$1,250,000

Expected win rate: 28%

Closed Won Opportunities

$8,500,000

Win rate: 41%

12
8
5
3
1
Discovery
Qualified
Response
Submitted
Award

Enterprise security and governance

Your data stays yours. Locked down, certified, hosted where you choose.

ISO 27001

Enterprise-grade security with ISO 27001 certification. Your data is protected by industry-leading standards.

No AI Training

Your data is never used to train AI models. Your competitive intelligence stays yours alone.

Data Residency You Control

Your data, your jurisdiction. Host in the EU, US, or Australia with complete sovereignty over where your information resides.

Trusted by many, including:

Impact, measured.

Four outcomes teams see after moving their tender response process onto Tendl.

Up to 90%

Reduction in tender development time

Complex utility contracts (case study).

Inside 30 days

Live revenue pipeline forecast

Typical onboarding and rollout timeframe.

Up to 50%

Lower cost per win

Reduced production hours through reuse.

2–3 hrs/day

Saved per day by managers

Less chasing, fewer rewrites, cleaner approvals.

We'll show how each metric is measured in your demo.

Ensuring great suppliers take advantage of great opportunities.

The Tendl mission.

Case Evidence
"Development time for tender responses dropped by up to 90%. What previously took several weeks was completed in a matter of days. Automated checks ensured all mandatory requirements were addressed, and multiple contributors could work simultaneously, reducing bottlenecks and ensuring rapid turnaround."
Hyde Park Solutions Hyde Park Solutions (HPS)
Read the case study
Insights

Why do capable firms lose tenders to weaker competitors

"In technical contracting the firm that wins is often not the strongest engineer, it is the one whose bidding carries less friction and reuses proven positions instead of rebuilding them. What separates the consistent winner is a system that holds qualified positions and evidence in one place so each response builds on the last."
Read the article
Features

Go/No-Go Scoring

"Structured qualification against weighted criteria. Relationship, capability, past performance, price, incumbent advantage, capacity. Column fodder detection built in. Pursue, pursue with conditions, or decline."
Read the update
From The Founder

What does it actually cost you to produce a bid?

"Most companies can tell you their cost per hire and their gross margin by project type. Almost none have calculated the fully loaded cost of producing a single tender submission."
Read the post
Press Coverage

Anonymity cuts both ways: what Section 94 means for supplier qualification in UK public infrastructure

"Laurie Nicol writing in New Civil Engineer on what Section 94 of the Procurement Act 2023 means for suppliers competing in UK defence, nuclear, and critical infrastructure."
Read the coverage
Joint Industry Insight

Governance Considerations for AI in Procurement

"AI has moved through the tendering process faster than the norms meant to govern it. Suppliers draft with it and buyers evaluate alongside it, yet few on either side operate under a settled framework for responsible use. This closing article in the series sets out the governance questions both buyers and suppliers now have to answer, and what a workable position looks like for each."
Read the article

Research Tendl with your own AI.

The strongest case for Tendl is the one you build yourself. Open the assistant you already use and let it evaluate us from public sources.

Each opens in a new tab with the evaluation prompt ready.

From sign-up to tendering in 30 minutes.

Set up, load your business information, and start your first bid.

Setup 2 of 3
Company profile
Team members
Bid preferences
Continue

Commercial Onboarding

30-minute setup session with Customer Success or new Guided AI.

Integrations 3 sources
SharePoint Connected
HubSpot Connected
Upload Add

3 sources synced

Connect Your Evidence

Securely connect SharePoint or upload directly. Documents are governed, version controlled, and structured into reusable assets.

Ready
to Bid
Documents Responses
SH

Capability (Relevant Experience)

Demonstrated experience across utilities and gov...

BN

Software

Location: QLDCouncil
LN

WHS Capability Statement

Our WHS management system is certified to ISO 45001...

JR

Local Supplier

Location: QLD

Build Your Response Library

Replicate what good looks like. Draw from your gold standard responses.

See the AI-First Response Management System in action.